The hard supported balancing machine has strict requirements for the foundation, generally requiring the quality of the foundation to be 20-30 times the maximum measured mass of the balancing machine. The balancing machine should be installed on a solid cement floor, preferably on the ground floor, and should be avoided from places where strong vibration sources such as punching machines, cutting machine air pumps, etc. enter.
1. Installation requirements for small balancing machines
Due to the light weight of the measuring tool itself, while the weight of the balancing machine itself is already heavy, such as SA-2 (1.6KG), SA-4 (16KG), SC-3 (5KG) and other balancing machines, they can be directly leveled to stabilize the balancing machine or fixed with expansion screws.
Manufacturer customization of hard support balancing machine
Attention: If the ground is uneven, hard materials such as shims can be used to level it, and soft materials such as wood, cardboard, and plastic should not be used to avoid affecting the measurement accuracy of the balancing machine.
2. Medium sized balancing machines need to be fixed with expansion bolts.
3. Large balancing machines have stricter requirements for the foundation, and it is necessary to excavate and fix the foundation according to the foundation drawing provided by the manufacturer. The foundation requires a depth of 500mm and a length to width ratio of 100-150mm beyond the base of the balancing machine.
1. Installation requirements for small balancing machines
Due to the light weight of the measuring tool itself, while the weight of the balancing machine itself is already heavy, such as SA-2 (1.6KG), SA-4 (16KG), SC-3 (5KG) and other balancing machines, they can be directly leveled to stabilize the balancing machine or fixed with expansion screws.
Manufacturer customization of hard support balancing machine
Attention: If the ground is uneven, hard materials such as shims can be used to level it, and soft materials such as wood, cardboard, and plastic should not be used to avoid affecting the measurement accuracy of the balancing machine.
2. Medium sized balancing machines need to be fixed with expansion bolts.
3. Large balancing machines have stricter requirements for the foundation, and it is necessary to excavate and fix the foundation according to the foundation drawing provided by the manufacturer. The foundation requires a depth of 500mm and a length to width ratio of 100-150mm beyond the base of the balancing machine.